Skip to content

MECHANICAL TIPPING DEMOLITION

The spectacular mechanical demolition by radio-controlled tracked excavator-robots of the piers of the Farma Viaduct in Tuscany.
Step 1 Mini robots raised to +80 m "lower" structure with hydraulic grippers
Step 2 Mechanical tipping of the 50 m high pile, from the ground with robotic excavator and hydraulic hammer
Back To Top