Skip to content

HOW WE WORK

ALL INCLUSIVE SERVICE

From the initial quote to the clean up after the demolition is complete, we ensure the highest standards reached by highly experienced teams. And you are working with a provider who considers the environmental impact of every decision made.

01.

SURVEY

Armofer Technical Management carries out an accurate inspection to evaluate the site, the structures, the works to be carried out in order to prepare the operational plans, the quote, the work phases and all the needs of the future site.

02.

SITE SET UP AND SAFETY (POS)

Taking over the areas, our technicians provide for the safety of the structures and the setting up of the offices in the field. Our H&S Manager prepares the Operational Safety Plan (POS) so that everything is ready to start. At the same time, our Logistics Service organizes all the resources, means and equipment necessary for the correct and most efficient operation of the site according to the work schedule.

03.

EXECUTIVE DESIGN OF INTERVENTIONS

Our Technical Office prepares the executive projects of each intervention to be carried out: Work Plans, Operational Plans, Demolition Plan; Operational Procedures of Intervention. They are shared with the Client, the Management, the Safety Managers and all the actors involved in the operational process, including the external control bodies.

04.

TRANSPORT AND TESTING MEANS

Our Service transports vehicles and equipment to the construction site and tests the demolition machines with the equipment chosen for the work to be carried out. We also arrange for the internal roll-off service for the proper transfer and disposal/recycling of materials.

05.

STRIPOUT AND SELECTIVE DISASSEMBLY

We get into the heart of the operation:
- selective dismantling and deconstruction
- soft stripping services (floor, windows, fittings…)
- cleaning up
- segregation and classification by CER codes

06.

ASBESTOS/AVF MANAGEMENT & REMOVAL – COMPACT

- securing covers for disassembly
- laying of anti-fall nets or/and provisional / temporary works designed ad hoc
- removal of Asbestos Containing Materials / AVF roofing sheets (compact)
- removal of Asbestos Containing Materials / AVF covering slabs (compact)
- setting up of treatment/confinement/preparation area in big bags for transport and disposal.

07.

ASBESTOS/AVF MANAGEMENT & REMOVAL - FRIABLE ACM/AVF

- confined areas set up, with UDP and UDM
- remediation in confined areas, manual / with mechanical means
- testing environments / smoke tests and restitution
- transport and disposal of hazardous waste (Licensed waste carrier)

08.

STRUCTURES DEMOLITION /DECOMMISSIONING

- UHD Ultra High Demolition / Top-down mechanical demolition
- demolition of reinforced concrete structures
- demolition of steel structures
- robotic demolition
- deconstruction and progressive dismantling
- site environmental management: reduction of noise, vibrations, emissions, dust- suppression
- PVC screen / projection and dust control

09.

PARTIAL AND CONTROLLED DEMOLITIONS / REINFORCED CONCRETE CUTTING

- sectioning of reinforced concrete structures with wire cut and diamond disk
- façade retention
- controlled demolition and selective dismantling

10.

DEMOLITIONS AND SPECIAL INTERVENTIONS

- design and implementation of special interventions
- demolition of chimneys and tanks
- aerial demolition with hydraulic power unit
- demolitions with explosives
- radio/video supervised demolitions
- night work
- emergency response

11.

MATERIAL VOLUMETRIC REDUCTION

- secondary demolition on the ground
- iron separation
- mechanical volume reduction
- onsite concrete crushing & screening
- sorting by EWC codes
- materials recovery and recycling
- direct disposal

12.

EXCAVATIONS AND URBANIZATIONS

- excavation and earth moving activities
- urbanizations

13.

LAND REMEDIATION / TANKS

- analysis and characterization of sites
- heap handling
- bio-bonification, soil-washing, removal of pollution from environmental media
- capping and inerting
- remediation of underground storage tanks
- all administrative and legal requirements

14.

WASTE MANAGEMENT & RECYCLING

- transport of materials to selected reclamation yards / landfill
- transport of hazardous materials according to regulations, authorized vehicles

15.

SITE MOBILIZATION

- final clean up
- loading of vehicles and equipment for the warehouse
- demobilization of site offices

Back To Top