Lowering System 2500
Lowering System 2500 Nella centrale Tirreno Power di Vado Ligure Armofer sta ultimando le fasi di calata delle caldaie grazie alla propria tecnologia Lowering System, sviluppata con Enerpac, in grado…
BOILER GROUP DECOMMISSIONING TIME LAPSE
Rossano Boiler Decommissioning Completed the massive decommissioning work Armofer presents the time-lapse of the footage taken with two fixed cameras: phase by phase, day by day here is the spectacular work of...
METAL CHIMNEY AND STEAM GENERATOR DEMOLITION
Armofer's intervention in thermal power plant to reclaim and dismantle a steam generation plant, its pipe-rack and 100m-high metal chimney, hot-cut in...
DECOMMISSIONING SPECIALISTS
The history of demolition technologies, the story of the company that has been involved in special demolition, environmental remediation and decommissioning work for 60 years. We look back over 50 years of history...
DEMOLIZIONE CAMINO METALLICA
Controlled disassembly of double-barrel metal chimney in thermoelectric power plant. Disassembly is carried out hot, repeated 17 times for the stripping of as many as 100 m high chimney ashlars,...
MECHANICAL TIPPING DEMOLITION
The spectacular mechanical demolition by radio-controlled tracked excavator-robots of the piers of the Farma Viaduct in Tuscany. Phase 1: mini robots raised to +80 m "lower" the structure with hydraulic crushers
DAY EVENT 10/09/2011 AT 2:38 PM
The exciting spectacle of the demolition by overturning 2two 9-story high concrete buildings. Pieve Emanuele, September 10, 2011, 2:38 pm, in the presence of the Authorities, Technicians, journalists...