DEMOLITION OF METAL CHIMNEY
Controlled dismantling of the double-barrel metal chimney in a thermoelectric power plant. The dismantling is carried out hot, repeated 17 times for the removal of the same number of 100 m high chimney segments, and is carried out by a dedicated 750 tonne truck crane.