Cassano d’adda
A2A POWER PLANT Demolition of GVR plant, metal chimney and associated service pipe-rack . Armofer tackles decommissioning of a power group ...
A2A POWER PLANT Demolition of GVR plant, metal chimney and associated service pipe-rack . Armofer tackles decommissioning of a power group ...
La storia delle tecnologie di demolizione, la storia dell’azienda che da 60 anni si occupa di demolizioni speciali, bonifiche ambientali…
Smontaggio controllato della ciminiera metallica a doppia canna in centrale termoelettrica. Il sezionamento avviene a caldo, ripetuto 17 volte per…
ENEL POWER PLANT Decommissioning Thermoelectric Group The industrial decommissioning site is opened in March 2021. The work is being carried out...
Armofer is proud to announce the opening of the industrial decommissioning site in Vado Ligure.
New contract for Armofer as part of the reconversion of the Tirreno Power plant in Vado Ligure.
Armofer will demolish a new plant at the ENEL Thermoelectric Power Station in Rossano Calabro.
COSTRUZIONI, the italian onstruction magazine devotes 8 pages to the spectacular controlled dismantling of the chimney
Armofer inizia oggi la descostruzione della ciminiera metallica. Il primo taglio, eseguito a caldo, dai tecnici sollevati in quota, viene…
La spettacolare demolizione meccanica con escavatori-robot cingolati radiocomandati delle pile del viadotto Farma, in Toscana. Fase 1: mini robot sollevati…