Skip to content

Work begins on the Torre dei Moro

Armofer has taken over the area of via Antonini 32, devastated by the fire in August 2021

The construction site for the safety of the Torre dei Moro building, 16 floors high and 60 m high, which was devastated by fire in August 2021, is already open and operational. The Armofer technicians will ensure the safe and controlled disassembly of the metal carpentry elements on the façade.

Back To Top